Project Description

Khartoum New International Airport

Project Title Aircraft Maintenance Center, Schematic Design
Airport Khartoum New International Airport
IATA / ICAO KRT / HSSS
Location Khartoum, Sudan
Time Frame 2005 – 2007
Capacity 6.50 MAP
Client DC Dorsch Consult

Services:
Preliminary Design + Outline Planning Services, Technical Specification and Tender Documentation, Participation during the Tender- and Evaluation Process

Objectives:
Principle areas of focus for the aircraft maintenance facilities are:
Apron area: 65.000m² with 6 Code-D positions
Hangar capacity: 1 Code-D and 2 Code-C positions
Staff: 300 people at the workshop, 150 per shift; 30 employees for the administration functions
The maintenance area is situated to the east of the runway and to the south of taxiway “sierra”. The overall maintenance area, without apron, for the first phase comprised approx. 37.500m² and is to form the maintenance hangar, workshops, administrative areas and the allocated parking lots.

68%

FAST TRACK PROJECT

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.

39%

CAPEX REDUCTION

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.