Project Description
Khartoum New International Airport
Project Title | Aircraft Maintenance Center, Schematic Design |
Airport | Khartoum New International Airport |
IATA / ICAO | KRT / HSSS |
Location | Khartoum, Sudan |
Time Frame | 2005 – 2007 |
Capacity | 6.50 MAP |
Client | DC Dorsch Consult |
Services:
Preliminary Design + Outline Planning Services, Technical Specification and Tender Documentation, Participation during the Tender- and Evaluation Process
Objectives:
Principle areas of focus for the aircraft maintenance facilities are:
Apron area: 65.000m² with 6 Code-D positions
Hangar capacity: 1 Code-D and 2 Code-C positions
Staff: 300 people at the workshop, 150 per shift; 30 employees for the administration functions
The maintenance area is situated to the east of the runway and to the south of taxiway “sierra”. The overall maintenance area, without apron, for the first phase comprised approx. 37.500m² and is to form the maintenance hangar, workshops, administrative areas and the allocated parking lots.
FAST TRACK PROJECT
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.
CAPEX REDUCTION
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.